Project

Updated Stefan Jacobsen

As a project manager, you need full control over the driving associated with your projects. With Autogear you can easily link each trip to a specific project. This gives you an overview of the costs for each project through a dedicated report.

Two ways to get projects onto trips

1. Automatically via the address list in Places

By linking a project to an address, trips that stop at the address will automatically have the project added.

Here's how:

Prosjekt adresse

2. Adding manually

Add a project to trips in the Inbox. It's as simple as this:

Prosjekt innboks GIF.gif

Add or edit projects

You add and edit projects here: https://app.autogear.com/dashboard/projects

  • ID – Optional to use. Example: 101
  • Name – Required, fill in your own name. Example: Deliveries
  • Valid from – Optional to use. If left blank, it applies indefinitely. If you limit it to a specific date, trips before this date will not be able to use this project.
  • Valid to – Optional to use. If left blank, it applies indefinitely. If you limit it to a specific date, trips after this date will not be able to use this project.
  • Project manager – Required to select.
  • Project participants – Default value: all users on the account. By selecting users, only those selected will be able to see and use the project.
  • Status – Default value: active project. If needed, you can close the project, after which it will no longer be visible or possible to use.

Get a project report

Read more

Import project from other systems

Was this article helpful?

0 out of 0 found this helpful